PRODUCTION FACILITIES
menu-upline
Geographical setting

Particulars of Vessels Lifted or under Construction:

Activities

 

Production Area No. 1

Production Area No. 2

Maximum length (depending on
fore or aft overhangs)

180-185 m

140-160 m

Maximum width

25,5 m

32,5 m

Maximum launching draft

4,5 m

4,0 m

Launching weight

10 000 t

6 000 t

a_menu_butt_pressed_3
Reference-list
Quality
Vacancies
About us
Contects

Point the object to see details

Building Berth and Launching ArrangementTransborder for Moving Blocks to Building Berth

Production Area No. 1

 1  Metal Stock
 2  Metal Shot-Blasting and Painting Site
2a Metal Cutting and Bending Site
2b Large Metal Plates Cutting and Bending Site
 3  Hull Production Shop Premises No.1
3a Hull Production Shop Premises No.2
 Large block Assembly Building
 5  Transborder for Moving Blocks to Building Berth
 6  Open Building Slip
 7  Building Berth
 8  Flooding Docking Chamber
 9  Pipe production and Installation Premises
10 Outfitting Site
11 Painting Premises
12 Outfitting Quay No.1
13 Utilites Quay

Production Area No. 2

14 Covered Slip
15 Building Berth and Launching
   Arrangement
16 Outfitting Components
   Production Premises
17 Warehoused
18 Outfitting Quay No.3

   Port Activities
19
 Outfitting Quay No.2
20 Port Cargo Handling Site,
   Customs Zone

Diagram of Ship Construction
Site at Production Area No.1

Diagram of Ship Construction
Site at Production Area No.2

Click on the diagram to enlarge (will open in a new window)

HomeTop of the page
language_selector_backgr-en

Geographical setting | Structure | Activities | Production facilities
Reference-list | Order book | Quality | Vacancies | About us |
Contacts

JSC "Kherson Shipyard", Kherson, Ukraine
GRADES WebPage